What's new

DRILLING ON CHEMIN DE LA MINE

The Municipality of Chelsea wishes to inform residents that drilling will take place on chemin de la Mine December 14 and 15, 2017, as part of SNC-Lavalin’s geotechnical study.

Modification to the winter maintenance procedures - district1

Notice to residents of Ward 1

Please take note that at the Council meeting of December 4, 2017, a resolution was adopted modifying the procedures for the winter maintenance of the roads of district 1.

The modifications to the winter maintenance procedures are as follows:

The spreading of abrasives will now be done:

·        On the full width of roads in curves, slopes and intersections only:

o   Over a distance of thirty (30) meters before and after curves and slopes

Access to the railway

Notice to residents

Please note that access to the railway is closed between chemins Wright and Loretta and chemins des Artisans and Welka because of recent landslides.  Access to the railway will be allowed once the stabilization work has been completed.

Council plans to hold an information session on the geotechnical and environmental studies of the community trail in January 2018.  A charette (co-design consultation) is planned for February 2018.  The details for these sessions will be released as soon as possible.

Pages

Subscribe to our new mailing list

* requis/indicates required
Informations souhaitées/preferred

No front page content has been created yet.